H. K. Alfares, Dual-based optimization of cyclic four-day workweek scheduling, IMA Journal of Management Mathematics, vol.11, issue.4, pp.269-283, 2000.
DOI : 10.1093/imaman/11.4.269

T. Aykin, A comparative evaluation of modeling approaches to the labor shift scheduling problem, European Journal of Operational Research, vol.125, issue.2, pp.381-397, 2000.
DOI : 10.1016/S0377-2217(99)00413-0

J. F. Bard, C. Binici, and A. H. Desilva, Staff scheduling at the United States Postal Service, Computers & Operations Research, vol.30, issue.5, pp.745-771, 2003.
DOI : 10.1016/S0305-0548(02)00048-5

N. Beaumont, Scheduling staff using mixed integer programming, European Journal of Operational Research, vol.98, issue.3, pp.98-473, 1997.
DOI : 10.1016/S0377-2217(97)00055-6

P. M. Bobrowski and P. S. Park, An evaluation of labor assignment rules when workers are not perfectly interchangeable, Journal of Operations Management, vol.11, issue.3, pp.257-268, 1993.
DOI : 10.1016/0272-6963(93)90003-8

M. J. Brusco and L. W. Jacobs, Optimal Models for Meal-Break and Start-Time Flexibility in Continuous Tour Scheduling, Management Science, vol.46, issue.12, pp.1630-1641, 2000.
DOI : 10.1287/mnsc.46.12.1630.12074

H. G. Chen, V. Chapurlat, and F. Prunet, Heuristic for operator scheduling in group technology cells Covè s, C., Analyse et estimation de performances de processus d'entreprise Implementation of an approach of performance estimation for enterprise process analysis, Comput. Oper. Res, vol.27, issue.2, pp.261-276, 1995.

G. B. Dantzig, A comment on Edie's traffic delays at tool booths, Oper. Res, issue.2, pp.339-341, 1954.

A. Drejer, How can we define and understand competencies and their development? Technovation, pp.135-146, 2001.
DOI : 10.1016/s0166-4972(00)00031-6

A. L. Eckstein and T. R. Rohleder, Incorporating human resources in group technology/cellular manufacturing, International Journal of Production Research, vol.36, issue.5, pp.1199-1222, 1998.
DOI : 10.1080/002075498193282

L. Franchini, Aide a` la de´cisionde´cision pour la gestion des ope´rateursope´rateurs de production, 2000.

L. Franchini, E. Caillaud, P. Nguyen, and G. Lacoste, Workload control of human resources to improve production management, International Journal of Production Research, vol.39, issue.7, pp.1385-1403, 2001.
DOI : 10.1080/00207540010022322

L. Franchini, E. Caillaud, P. Nguyen, and G. Lacoste, Planning and scheduling skills: a case study in an agri-food industry, SMC'98 Conference Proceedings. 1998 IEEE International Conference on Systems, Man, and Cybernetics (Cat. No.98CH36218), pp.417-422, 1998.
DOI : 10.1109/ICSMC.1998.725447

D. E. Guest, Human resource management and performance: a review and research agenda, The International Journal of Human Resource Management, vol.8, issue.3, pp.263-276, 1997.
DOI : 10.1080/095851997341630

J. Hao, P. Galinier, and M. Habib, Me´taheuristiquesMe´taheuristiques pour l'optimisation combinatoire et l'affectation sous contraintes, Rev. Intell. Artif, vol.13, pp.283-324, 1999.

R. Hung, Scheduling a workforce under annualized hours, International Journal of Production Research, vol.37, issue.11, pp.2419-2497, 1999.
DOI : 10.1080/002075499190581

T. Jia, Vers une meilleure gestion des performances d'un groupe autonome de fabrication, 1998.

J. Kembel, ROLE Play ? Personalities in Action, Life Change Partners, 1996.

H. V. Kher, M. K. Malhotra, P. R. Philipoom, and T. D. Fry, Modeling simultaneous worker learning and forgetting in dual resource constrained systems, European Journal of Operational Research, vol.115, issue.1, pp.158-172, 1999.
DOI : 10.1016/S0377-2217(98)00190-8

S. Kirkpatrick, C. D. Gelatt, and M. P. Vecchi, Optimisation by Simulated Annealing, Research Report RC, vol.9355, 1982.

K. Kolbe, Pure Instinct, 1994.

A. Kulanoot, Algorithms for some hard knapsack problems, 2000.

A. Kusiak and M. Chen, Expert systems for planning and scheduling manufacturing systems, European Journal of Operational Research, vol.34, issue.2, pp.113-130, 1988.
DOI : 10.1016/0377-2217(88)90346-3

C. A. Lengnick-hall and M. L. Lengnick-hall, Strategic human resources management: a review of the literature and a proposed typology, Acad. Manag. Rev, vol.13, pp.454-470, 1988.

B. L. Mccarthy, J. R. Wilson, and S. Crawford, Human performance in industrial scheduling: A framework for understanding, Human Factors and Ergonomics in Manufacturing, vol.31, issue.57, pp.299-320, 2001.
DOI : 10.1002/hfm.1016

A. M. Mcewan and P. Sackett, The human factor in CIM systems: worker empowerment and control within a high-volume production environment, Computers in Industry, vol.36, issue.1-2, pp.39-47, 1998.
DOI : 10.1016/S0166-3615(97)00096-1

K. N. Mckay, J. A. Buzacott, N. Charness, and F. R. Safayeni, The Scheduler???s Predictive Expertise: An Interdisciplinary Perspective, Artificial Intelligence In Operational Research, pp.139-150, 1992.
DOI : 10.1007/978-1-349-12362-9_15

K. L. Medsker and J. P. Fry, Acquisition of interpersonal communication skills: A research-based approach, Telematics and Informatics, vol.14, issue.3, pp.209-218, 1992.
DOI : 10.1016/S0736-5853(97)00005-1

N. Metropolis, R. Rosenbluth, M. Rosenbluth, A. Teller, and E. Teller, Equation of State Calculations by Fast Computing Machines, The Journal of Chemical Physics, vol.21, issue.6, pp.1087-1092, 1953.
DOI : 10.1063/1.1699114

G. Mosheiov, Scheduling problems with a learning effect, European Journal of Operational Research, vol.132, issue.3, pp.687-693, 2001.
DOI : 10.1016/S0377-2217(00)00175-2

R. Narasimhan, An Algorithm For Multiple Shift Scheduling of Hierarchical Workforce On Four-Day Or Three-Day Workweeks, INFOR: Information Systems and Operational Research, vol.38, issue.1, pp.14-32, 2000.
DOI : 10.1080/03155986.2000.11732398

B. A. Norman, W. Tharmmaphornphilas, K. L. Needy, B. Bidanda, and R. C. Warner, Worker assignment in cellular manufacturing considering technical and human skills, International Journal of Production Research, vol.33, issue.6, pp.1479-1492, 2002.
DOI : 10.1016/0377-2217(93)90016-G

C. H. Papadimitrou and K. Steiglitz, Combinatorial Optimization: Algorithms and Complexity, 1982.

D. O. Parsons, Specific Human Capital: An Application to Quit Rates and Layoff Rates, Journal of Political Economy, vol.80, issue.6, pp.1120-1143, 1972.
DOI : 10.1086/259961

D. Pisinger, A minimal algorithm for the multiple-choice knapsack problem, European Journal of Operational Research, vol.83, issue.2, pp.394-410, 1995.
DOI : 10.1016/0377-2217(95)00015-I

D. Pisinger, Algorithms for knapsack problems, 1995.

T. L. Saaty, The Analytical Hierarchy Process, 1980.

E. Soubeiga, Development and application of hyperheuristics to personnel scheduling, p.4587, 2003.

J. L. Baptiste, P. Soumis, and F. , Etude bibliographique de l'ordonnancement simultane´dessimultane´des moyens de production et des ressources humaines, Proceedings of the 5th French-Quebec International Congress of Industrial Engineering, 2003.

G. L. Vairaktarakis, X. Cai, and C. Y. Lee, Workforce planning in synchronous production systems, European Journal of Operational Research, vol.136, issue.3, pp.551-572, 2002.
DOI : 10.1016/S0377-2217(01)00056-X

T. J. Williams, Development of GERAM, A Generic Enterprise Reference Architecture and Enterprise Integration Methodology, Integrated Manufacturing Systems Engineering, pp.279-288, 1995.
DOI : 10.1007/978-0-387-34919-0_19

T. J. Williams, The Purdue enterprise reference architecture, Computers in Industry, vol.24, issue.2-3, pp.141-158, 1994.
DOI : 10.1016/0166-3615(94)90017-5

P. Wright and S. Snell, Toward an integrative view of strategic human resource management, Human Resource Management Review, vol.1, issue.3, pp.203-225, 1991.
DOI : 10.1016/1053-4822(91)90015-5