R. G. Askin and Y. Huang, Forming effective worker teams for cellular manufacturing, Int. Journal. of Production Research, issue.11, pp.2431-2451, 2001.

B. Bidanda, P. Ariyawongrat, K. Lascola-needy, B. A. Norman, and W. Tharmmaphornphilas, Human related issues in manufacturing cell design, implementation, and operation: a review and survey, Comp. & Indus. Eng, vol.48, pp.507-523, 2005.

M. Bennour, D. Crestani, O. Crespo, and F. Prunet, Computer aided decision for human task allocation with mono and multi performance evaluation, Int. Journal. of Production Research, issue.21, pp.4559-4588, 2005.
URL : https://hal.archives-ouvertes.fr/lirmm-00105309

E. Boucher, B. Legeard, H. Zidoum, and G. Guérineau, Utilisation de la PLC ensembliste pour la modélisation et la résolution d'un problème d'affectation, GdR Automatique du CNRS, pp.151-164, 1995.

A. El-mhamedi, Sur l'Intégration des Aspects Humains sur la Conduite Multi-Niveaux d'Ateliers de Production, 1990.

L. Franchini, Aide à la Décision pour la Gestion des Opérateurs de Production : Modélisation, Planification et Evaluation, 2000.

B. Grabot and A. Letouzy, Short-term manpower management in manufacturing systems : new requirement and DSS prototyping, Comp. in Indus, vol.43, pp.11-29, 2000.

M. Gronalt and R. F. Harlt, Workforce planning and allocation for mid-volume truck manufacturing : a case study, I. J. P. R, vol.41, issue.3, pp.449-463, 2003.

M. Harzallah, Modélisation des Aspects Organisationnels pour la Réorganisation d'Entreprises Industrielles, 2000.

T. Jia, Vers une meilleure Gestion des Ressources d'un Groupe Autonome de Fabrication, 1998.

K. Kolbe and P. Instinct, , 1994.

A. M. Mcewan and P. Sackett, The human factor in CIM systems: worker empowerment and control within a highvolume production environment, Comp. in Indus, vol.36, issue.1-2, pp.39-47, 1998.

G. Mosheiov, Scheduling problem with learning effect, E.J.O.R, vol.13, pp.687-693, 2001.

J. Murphy and D. A. Nembhard, Heuristic approach for assigning workers to tasks based on individual learning rates, Int. Journal. of Production Research, vol.39, issue.9, pp.1955-1968, 1994.

B. A. Norman, W. Tharmmaphornphilas, K. L. Needy, B. Bidanda, and R. C. Warner, Worker assignment in cellular manufacturing considering technical and human skills, I.J.P.R, vol.40, issue.6, pp.1479-1492, 2002.

L. Pichot and P. Baptiste, Ordonnancement des ressources humaines : étude de cas d'une entreprise d'injection plastique, 3 ème MOSIM'01, vol.2, pp.707-714, 2001.

C. Pourcel and D. Gourc, Présentation de la Méthode MECI, Ecole de Printemps du Groupe Modélisation d'entreprise, 2002.

T. L. Saaty, The Analytical Hierarchy Process, 1980.

J. Tchommo, P. Baptiste, and F. Soumis, Etude bibliographique de l'ordonnancement simultané des moyens de production et des ressources humaines, 5 ème Congrès International de Génie Industriel, 2003.