A Flexible Aware Budgeting for Hierarchical Flow Timing Closure - LIRMM - Laboratoire d’Informatique, de Robotique et de Microélectronique de Montpellier Accéder directement au contenu
Communication Dans Un Congrès Année : 2004

A Flexible Aware Budgeting for Hierarchical Flow Timing Closure

Résumé

We present a new block budgeting algorithm which speeds up timing closure in timing driven hierarchical flows. After a brief description of the addressed flow, block budgeting challenges are detailed. Then, we explain why existing budgeting approaches are not adapted to fulfil these challenges. A new block budgeting algorithm is proposed. In order to derive relevant block constraints, this algorithm analyzes the design flexibility. This flexibility aware budgeting (FAB) approach is then compared to some previous ones. Experiments based on commercial EDA tools and real designs show up to 55 % reduction in hierarchical flow run time and lead to a good flow timing closure.
Fichier non déposé

Dates et versions

lirmm-00108940 , version 1 (23-10-2006)

Identifiants

Citer

Olivier Omedes, Michel Robert, Muhammad Ramdani. A Flexible Aware Budgeting for Hierarchical Flow Timing Closure. ICCAD 2004 - 1st IEEE International Conference on Computer Aided Design, Nov 2004, San Jose, United States. pp.261-265, ⟨10.1109/ICCAD.2004.1382583⟩. ⟨lirmm-00108940⟩
43 Consultations
0 Téléchargements

Altmetric

Partager

Gmail Facebook X LinkedIn More